among our experience

Recent Projects

EPCC/ PCC FOR MECHANICAL,
PIPING & CIVIL

Job / Work DescriptionClient CompanyYear
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) OF FILTER WATER SEPARATOR (FWS) AND ASSOCIATED WORKS AT KLIAKUALA LUMPUR AVIATION FUELLING SYSTEM (KAFS)2016
PROVISION OF REPLACEMENT CO2 ABSORBER COLUM FOR TA5 2017PETRONAS CHEMICALS AMMONIA SDN BHD2017
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) OF MBC PILOT PLANT PROJECT AT TERENGGANU GAS TERMINAL (TGAST)PETRONAS CARIGALI SDN BHD2018
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR THE SUPPLY OF CARBON DIOXIDE (C02) PROJECT AT GAS PROCESSING KERTIH (GPK)PETRONAS GAS BERHAD2018
ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISSIONING OF MAJOR REPAIR WORK AND CONVERSION FOR TANK NO.11PDB PRAI FEUL TERMINAL2019
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF ALUMINUM GEODESIC DOME ROOF FOR CRUDE TANK D-901PETRONAS PENAPISAN (TERENGGANU) SDN. BHD2020
PROVISION OF Q-802B TANKS REJUVENATION (“TANKQ”) AT TANJUNG SULONG EXPORT TERMINAL (TSET)PETRONAS GAS BERHAD2021

TANK MAINTENANCE

Job / Work DescriptionClient CompanyYear
MASTER SERVICE AGREEMENT (MSA) FOR ATMOSPHERIC STORAGE TANK CLEANING AND MAINTENANCE SERVICES– PETRONAS PENAPISAN (TERENGGANU) SDN. BHD
– PETRONAS GAS BERHAD
– PETRONAS CARIGALI SDN BHD
– PETRONAS DAGANGAN SDN BHD
– PETRONAS CHEMICALS AMMONIA SDN BHD
2016 – 2021
TANK INTERNAL CLEANING AND DOSH INSPECTION
ON T-0003B
KANEKA PASTE POLYMERS SDN.BHD.2019
VCM SPHERICAL TANK DOSH INSPECTION TANK A.BT-0003AKANEKA PASTE POLYMERS SDN.BHD.2020
EJECTOR CONDENSER & LIQUID/VAPOR LINE TO HOTWHELL CHEMICAL CLEANINGFPG OLEOCHEMICALS SDN BHD2020
T-951 : FEB 2021 BD TANK DOSH INSPECTIONKANEKA (MALAYSIA) SDN BHD2021
T-952 : APR 2021 BD TANK DOSH INSPECTIONKANEKA (MALAYSIA) SDN BHD2021
APRIL 2022 VCM SPHERICAL TANK DOSH INSPECTION TANK B BT-0003BKANEKA PASTE POLYMERS SDN BHD2022

TURNAROUND / SHUTDOWN

Job / Work DescriptionClient CompanyYear
To Supply Manpower, Tools, Equipment and Consumable For 2015 Turnaround For DOSH Registered Equipment at KTSBKertih Terminals Sdn Bhd2014
FPG 2015 Plant Turnaround WorksFPG OLEOCHEMICALS SDN BHD2015
DOSH CF Renewal For Five (5) Exchangers E120, E122, E126, E131, E225 During Mini Shutdown 2015PETRONAS Chemicals Ethylene Sdn. Bhd.2015
DOSH Inspection – 9 Unit BOG Equipment for CF RenewalKerteh Terminal Sdn. Bhd2015
FPG PLANT MAJOR TURNAROUND 2021FPG OLEOCHEMICALS SDN BHD2021
EMERGENT REPAIR TA 2021FPG OLEOCHEMICALS SDN BHD2021

We Provide the Best Service in Industry​